Indoor Astroturf Companies and Selection Guide
May 15, 2026Regular Football Pitch Construction: All Stages
May 21, 2026Steel astroturfs, which have become an indispensable part of modern sports facilities, offer ideal solutions for football, hockey and other sports. Experienced construction companies such as Türksas offer steel astroturf construction services at the highest standards, providing users with durable, aesthetic and functional facilities. In this article, we will examine in detail the advantages, technical specifications and important cost factors of steel astroturf construction.
What is Steel Astroturf Field?
Steel astroturf pitches are sports facilities built on steel construction and covered with artificial turf or synthetic material. These pitches are based on a strong steel skeleton system and high quality carpet materials are laid on it. In such facilities, players can move safely, the fields are easy to maintain and can be used for many years.
Steel astroturf construction is a combination of modern construction techniques and sports facility design. Professional teams meticulously carry out all stages such as land measurements, design of the steel structure, preparation of the foundation and installation of the carpet cover. Türksas provides the best solutions to its customers with its expertise and experience in this field.
Depending on the dimensions and intended use of the sites, steel construction, material selection and equipment requirements are determined. Each project is evaluated within the special conditions and designs are prepared in accordance with the needs of the customer.
Materials Used in the Construction of Steel Astroturf Field
The quality of the materials used in astroturf construction directly affects the life and performance of the facility. Steel construction materials are selected to have high corrosion resistance and appropriate protection processes are applied. High strength steel grades such as S275 and S355 are often preferred for the carrier system.
It is common to use polyethylene, polypropylene or hybrid synthetic turf as carpet material. These materials are resistant to UV rays, provide fast drainage in heavy rainfall and minimise athlete injuries. The choice of quality carpet directly affects game performance and safety.
Sandy fill, drainage systems and elasticated soles are used in the ground infrastructure. These systems provide dumping in the peripheral area of the players, reduce the risk of injury and allow air to drain quickly under the pitch.
- High-strength steel profiles and constructions
- Synthetic carpet and artificial turf materials
- Drainage systems and ground preparation materials
- Tsinas, bolts and fasteners
- UV protective and anti-static coating
Technical Processes of Steel Astroturf Construction
The construction of a steel astroturf pitch goes through many technical stages from planning to completion. Firstly, land measurements of the field are made, maps and technical drawings are prepared. Before the project, ground survey is carried out and it is determined how the structure will sit.
Foundation works are carried out according to the design of the site and ground conditions. Establishment of the drainage system and infrastructure preparations are completed at this stage. In heavy rainfall areas, special drainage channel systems are designed.
Steel construction assembly progresses by joining the parts cut and pre-prepared in the factory in the field. Welding operations are carried out during precise measurements and quality control. Finally, the carpet is laid, the edges are fixed and the game lines are processed.
| Construction Phase | Duration (Days) | Main Activities |
|---|---|---|
| Land Preparation and Foundation Works | 5-7 | Measurement, construction of the greenhouse, installation of drainage system |
| Erection of Steel Construction | 7-10 | Frame installation, welding works, fastener compression |
| Carpet Laying and Finishing Works | 3-5 | Carpet installation, edge fixing, processing of lines |
Advantages of Steel Astroturf Construction
One of the main advantages of steel astroturfs is that they do not require maintenance compared to natural grass. There is no need for processes such as irrigation, grass mowing, weed removal. Therefore, operating costs remain significantly lower and the facilities can remain in continuous play.
The ability to operate 365 days a year regardless of weather conditions allows operators to provide regular income. The pitches do not have to be closed even in rain, snow or extreme heat. This flexibility guarantees the continuation of sports activities, especially during the winter months.
In terms of player safety, steel astroturfs are designed with rubber layers and elastic floor systems that reduce the risk of falling. Athlete injuries are minimised and professional training conditions are provided.
Aesthetically, steel astroturfs increase the value of the facilities with their modern appearance. Game lines and logos can be easily placed in various colour options. Lighting systems can be easily integrated.
- Low maintenance and operating costs
- Possibility of use independent of weather conditions
- Player safety and reduced risk of injury
- Modern and aesthetic design options
- Long lasting and durable construction
- High quality of gaming performance
Factors Determining the Cost of Steel Astroturf Construction
The cost of a steel astroturf construction differs depending on many variables. One of the most important factors is the size of the field. Larger fields require more steel, carpet and labour.
The design of the steel construction is also an important cost factor. The costs of open designs and closed domeless or domed sites will be different. Resistance to wind loads, snow load and climatic conditions are issues to be considered in the design.
The choice of carpet material quality is an important part of the total cost. High performance, UV resistant and long lasting carpets are priced differently from more economical options. The complexity of the drainage system, special floor conditions and additional equipment also affect the cost.
Construction location, working conditions and land accessibility should also be considered. Construction in the city centre may be charged differently compared to rural areas. Project management, engineering services and necessary permits are also included in the total cost.
| Cost Factor | Level of Influence | Description |
|---|---|---|
| Field Area | High | Large sites require more material and labour |
| Steel Construction Design | High | Open, closed or domed designs are differentiated |
| Carpet Material Quality | Medium-High | Premium carpets are more expensive than standard options |
| Ground Preparations | Centre | The scope of drainage systems and infrastructure preparation varies |
| Additional Equipment | Centre | Lighting, insulation and other system costs |
Steel Astroturf Construction Services with Turksas
Türksas is a reliable and experienced company specialised in sports facility construction. In steel astroturf construction, it is meticulous in understanding all the needs of customers and providing solutions. Professional support is provided at every stage from before to after the project.
The company works by setting high standards in terms of quality control and time management. Customer needs are taken into account during the design phase and engineering studies are carried out meticulously. During construction, work safety protocols are strictly implemented.
Türksas guarantees the authenticity of the materials used and ensures that they are sourced from appropriate sources. In completed projects, long-term durability and ease of maintenance are targeted. Customer satisfaction is the top priority for the company.
- Full project management and consultancy services
- Design and engineering studies
- Supply and installation of quality materials
- Occupational safety and quality control standards
- Post-project support and maintenance services
Frequently Asked Questions (FAQ)
1. What is the Lifespan of Steel Astroturf Fields?
Quality steel astroturfs can be used for 15-20 years and more under appropriate maintenance conditions. Steel construction is much longer lasting and the carpet material may need to be replaced periodically.
2. Is Outdoor or Indoor Field Better?
Both options have their advantages. Open fields are more economical, while closed fields provide better protection in extreme weather conditions. The investor's budget and business strategy is the determining factor.
3. What Should We Pay Attention to in Steel Astroturf?
Regular cleaning, inspection of the drainage system, structural inspection and periodic inspection of the carpet surface are recommended. Following a seasonal maintenance programme prolongs carpet life.
4. How many days is the construction period?
It varies between 2-4 weeks depending on the project size. Weather conditions and terrain may affect the process. The timetable to be prepared by Türksas specifies exact dates.
5. Can I start using the site immediately?
After the construction is completed, it may be necessary to wait a short time for the quality control to be completed and the carpet to stabilise. It can usually be fully opened for use after 3-5 days.
